| Stretch: | Powerhouse |
| Difficulty: | Class III |
| Distance: | 2.9 miles |
| Flows: | No Gauge. Estimate at put-in: 500 cfs |
| Gradient: | 85 fpm average |
| Put-in: | Above the powerhouse |
| Take-out: | Below the powerhouse |
| Shuttle: | 4.6 kms (15 minutes one-way) |
| Season: | Spring and ? (Powerhouse will dewater this section by 2019) |
| Written: | © 2017 |